Temporary swales guide runoff across a site, while check dams slow the flow so sediment can settle. Together, these adaptable controls help limit erosion during construction, with their layout shaped by slope, soil, and expected water volume.

Multiple Choice

Which temporary control measures can be designed as needed in runoff management?

Temporary swales and check dams are specifically designed to manage runoff during construction or other temporary disruptions to the landscape. These measures are flexible and can be adapted to suit the specific conditions of the site, such as slopes, soil types, and the volume of runoff expected. Temporary swales are shallow, grassy channels that can direct runoff and promote infiltration, which helps to reduce erosion and sediment transport. Check dams, on the other hand, are small barriers built across swales or channels to slow down the flow of water, allowing sediment to settle out and preventing it from being carried downstream. In contrast, permanent drainage systems are built for long-term use and are not designed to be temporary. Only silt fences provide a specific function related to sediment control but do not encompass a broader range of runoff management options, and grassed waterways are also generally permanent features intended for long-term sediment transport and erosion control, rather than being temporary measures. This is why temporary swales and check dams are the appropriate choice for temporary control measures in runoff management.

Temporary Swales and Check Dams: Small Measures That Make a Big Difference

Construction changes the way water moves across a site. A slope may be cleared, soil may be exposed, and compacted ground may shed rain faster than it once did. When a storm arrives, runoff can carry sediment toward a storm drain, stream, wetland, or neighboring property.

Temporary controls help manage that water while work is underway. Two useful tools are temporary swales and check dams. They can be shaped to fit site conditions, adjusted as construction changes, and removed or replaced when permanent drainage features are ready.

That flexibility matters. Runoff control rarely comes down to one structure placed in one spot. It’s a system of choices based on slope, soil, flow, and the timing of the work.

First, follow the water

Before selecting a control measure, consider where rainwater lands and where it goes. On a disturbed site, runoff may gather in low areas, cross a haul road, or rush down a freshly cut slope. Even a modest flow can erode loose soil if it’s concentrated in the wrong place.

Site inspections help reveal these patterns. Look for rills, muddy discharge, ponding, and sediment collecting near drains. Also pay attention to changes in the work area: a newly graded access route or an exposed stockpile can alter runoff paths overnight.

A useful plan considers both water and sediment. Water needs a safe route through or around the site. Sediment needs to stay in place, or be captured before it reaches a sensitive area. Temporary swales and check dams can help with both goals, but they work best when they’re part of a broader site plan.

Temporary swales guide the flow

A swale is a shallow channel that directs runoff along a planned route. A temporary swale may be shaped in soil and protected with vegetation, mulch, erosion-control blanket, stone, or another suitable lining. Its form depends on the site and the expected flow.

Unlike a narrow trench, a well-shaped swale spreads water across a broad, shallow path. That can reduce the speed of flow and lower the risk of erosion. Where soil and site conditions allow, water may also soak into the ground as it moves along the channel.

Temporary swales can be useful around the edge of a work zone, beside a road, or above a slope that needs protection. They may also redirect clean water around disturbed soil. That distinction is important: clean runoff should generally be kept separate from sediment-laden water when the site layout allows it. Mixing the two can increase the volume of water that needs treatment.

A swale must have a stable outlet. Sending water quickly toward an unprotected slope or stream can shift the problem downstream rather than solve it. Designers and site teams should check the channel’s grade, capacity, lining, and discharge point. If the swale is too steep or too small, water can cut into its bed and banks, carrying sediment along with it.

Check dams slow water down

A check dam is a small barrier placed across a drainage channel or swale. It slows the flow and can encourage some sediment to settle upstream. Common materials include stone, fiber rolls, or other products suited to the flow and site conditions.

The key word is small. A check dam isn’t meant to block a channel like a permanent dam. Water should pass over or through it in a controlled way, without cutting around the sides or washing out the structure. If water can slip around the edges, it may carve a new channel and cause more erosion.

Spacing matters, too. Check dams are often arranged so the crest of one structure is near the base of the next one upstream, though the right arrangement depends on the channel slope and design guidance. This creates a series of slower-flowing sections rather than one long, fast run.

They also need upkeep. Sediment that collects behind a check dam should be removed when it begins to reduce the structure’s function. A damaged barrier should be repaired or replaced promptly. These are simple structures, but “simple” doesn’t mean “set it and forget it.”

The two measures can work together

A temporary swale provides the route; check dams can calm the water moving through it. Used together, they form a practical line of defense in a drainage path. The swale guides runoff toward a stable outlet, while the check dams reduce velocity and help limit erosion along the channel.

Still, neither measure is a cure-all. A swale may need a protective lining where flow is strong or soil is easily eroded. Check dams may not suit a channel that carries too much water, or a location where they could create unsafe ponding. Design should account for the expected drainage area, rainfall, soil type, slope, and nearby resources.

It’s also worth remembering that sediment control measures have different jobs. A silt fence, for example, can intercept sediment in shallow sheet flow, but it isn’t a channel for directing larger volumes of runoff. If concentrated water flows into a silt fence, the fabric may fail or water may pass around it. Choosing a measure by name alone can miss the real issue: how water behaves at that specific location.

Temporary doesn’t mean casual

Temporary controls are built for a limited stage of work, but they still need sound design and regular attention. A control that works during early grading may become ineffective after the site changes. New roads, excavation, soil stockpiles, or completed building pads can shift drainage patterns.

Inspection is the moment to catch those changes. Check whether water is following the intended route, whether the channel is eroding, and whether sediment is building up where it shouldn’t. After heavy rain, look for overtopping, bypass flow, or damage at outlets. Small repairs made early can prevent a much larger cleanup later.

Construction schedules matter as well. Temporary measures should be installed before the related disturbance begins, not after muddy runoff has already reached a drain. If a swale must be crossed by equipment, the crossing needs to be planned so traffic doesn’t crush the channel or divert water onto unstable ground.

When work moves on, remove temporary structures only when it’s safe to do so and the next stage of drainage control is ready. A gap between temporary and permanent systems can leave bare soil exposed just when rain is most likely to cause trouble.

Match the measure to the job

Permanent drainage systems are designed for long-term service. Grassed waterways may also be lasting site features, while silt fences address a narrower sediment-control need. Temporary swales and check dams fill a different role: they can be shaped and placed to manage runoff during a changing phase of construction.

That distinction is useful for anyone involved in erosion and sediment control, including Certified Erosion, Sediment, and StormWater Inspectors (CESSWIs). The best measure isn’t necessarily the most familiar one. It’s the one that fits the flow path, soil, slope, and work schedule—and keeps performing as those conditions change.

Rain will always find the low point. Thoughtful temporary controls help make sure that low point leads to a stable, planned route rather than a muddy surprise downstream.